Who leads the migration of applications and data?
The customer or its integrator plans and validates applications, data, configurations, and rollback. ipcore prepares and coordinates the destination physical infrastructure.
PHYSICAL INFRASTRUCTURE MIGRATION · MADRID
Moving servers out of an office or switching colocation providers, from anywhere in Spain, requires preparing the destination before disconnecting the origin.
ipcore prepares and coordinates at MAD-NE the physical destination of the migration: rack, power, connectivity, access, goods-in, racking, cabling, and checks. The customer or its integrator leads the logical migration of applications, data, dependencies, change windows, rollback, and functional validation.

01 / Migración
Feasibility depends on racks, power, connectivity, logistics, windows, and responsibilities.
02 / Migración
| Area | ipcore at MAD-NE | Customer or integrator |
|---|---|---|
| Physical destination | Rack, power, A+B, access, and procedures | Validate that the configuration meets the architecture |
| Connectivity | Coordinate the agreed delivery method | Define destinations, addressing, routes, and dependencies |
| Logistics | Goods-in and access coordination | Packaging, transport, and insurance unless otherwise agreed |
| Installation | Racking, cabling, and physical connection | Logical configuration and credentials |
| Change | Physical checks and environment availability | Window, sequence, rollback, and functional validation |
| Subsequent operations | Remote hands and authorized work | Administration of systems, applications, and data |
This split lets each party work on the layer it knows and controls: ipcore on the physical destination and the customer or its integrator on the systems and services.
03 / Migración
Before setting a date, it helps to identify:
A sufficient inventory makes it possible to prepare the destination and begin planning.
04 / Migración
The destination must be ready before disconnecting the equipment:
When connectivity is critical, it should be tested as far as possible before the change window.
05 / Migración
The customer or its integrator must document:
ipcore coordinates the points that affect goods-in, access, physical installation, and connectivity, while the systems owner leads the functional sequence of the change.
06 / Migración
Hardware goods-in is available 24×7×365, subject to coordination and authorization.
Before shipping, the following must be agreed:
The scope of unpacking, inspection, and handling of transport incidents must appear in the project instructions.
07 / Migración
ipcore can perform:
Testing of applications, databases, users, and services belongs to the customer's functional plan.
08 / Migración
After the change, remote hands make it possible to handle physical work without traveling:
09 / Migración
The customer or its integrator plans and validates applications, data, configurations, and rollback. ipcore prepares and coordinates the destination physical infrastructure.
Yes. It must be defined and coordinated in advance. Delivery and the possibility of testing depend on the provider, the circuit, and the project.
Yes. Goods-in and physical work are available 24×7×365, subject to coordination, authorization, and contractual terms.
By preparing the rack, power, and connectivity in advance, defining a change window, and documenting backups, sequence, acceptance criteria, and rollback.
Yes. This page covers precisely the change of data center or provider, with destination preparation and physical coordination at MAD-NE.
Inventory, racks, power, connectivity, origin, target date, responsible persons, and the scope expected from ipcore.
10 / Migración
The move should not begin until the destination has been compared against verifiable criteria: power continuity, cooling, connectivity, access, physical on-site support, contractual terms, and the ability to migrate again.
Next step
With that context we can review the physical preparation of MAD-NE, the required connections, and each party's responsibilities.